Please ensure Javascript is enabled for purposes of website accessibility
SSI favicon

Adam Myhre

Director of Field Operations

Adam’s job is to assist sales managers during large projects by designing and building proposals, provide technical assistance to existing and potential customers, and work with the installation staff on technical jobs such as system commissioning and network migrations. Notable projects include:

  • Edgewater and Colorado Belle Casinos: Foreman during system installation at these sister properties. Commissioned IndigoVision VMS at both with approximately 600 total channels. Migrated existing system with no casino downtime.
  • The M Casino: Foreman during this new build, oversaw union sub-contractor, commissioned IndigoVision VMS with approximately 700 channels of IP video. Responsible for all gaming walkthroughs and inspections.
  • The Emerald Queen Casinos: Foreman during the installation of these sister properties. Commissioned IndigoVision VMS at both with approximately 1000 total channels of video. Migrated existing system with no casino downtime. Responsible for all gaming walkthroughs and inspections. A year later SSI installed approximately 100 IP cameras during an expansion.
  • French Lick Casino: Foreman during complete system overhaul in existing casino, 2 hotels, 2 golf courses and a couple offsite buildings tying 3 separate systems into a new Synectics VMS, approximately 1200 channels.
  • Little Creek Casino: Foreman during system expansion, event center and later a hotel addition. Endura VMS platform with approximately 800 channels and 9760 matrix. Migrated existing system with no casino downtime.
  • Magnolia Bluffs Casino: Foreman during the new build. Commissioned Vigilant VMS of approximately 300 channels. Responsible for all gaming walkthroughs and inspections.
  • Rivers Casino: Foreman during the new build and oversaw the union subcontractor. Commissioned Pelco VMS with approximately 700 channels and DSX access control system with approximately 40 doors. Responsible for all gaming walkthroughs and inspections.
  • Royal Beach Casino: Foreman during system expansion. IndigoVision VMS platform with approximately 400 channels. Migrated existing system with no casino downtime.
  • Sugar House Casino: Foreman during the new build and oversaw the union subcontractor, Commissioned Pelco VMS with approximately 700 channels and access control system with approximately 20 doors. Responsible for all gaming walkthroughs and inspections.
  • Table Mountain Casino: Foreman during system update and expansion from Pelco 1.x to 2.x and later a network migration from HP to Enterasys. Migrated existing system with no casino downtime.

Adam’s top 5 job-related strengths are his understanding of the gaming process and requirements, he is solutions-oriented, persistent, a major team player, and deadline driven. Adam is grateful he has the ability to drive positive changes for his team and for SSI, and he is happy to regard some of his coworkers as close friends.

Outside of work, Adam enjoys MMA, playing with his children, computer sciences, hiking, and camping.